BELOW SUPERNAV drop zone ⇩

‘We need to get people off the bridge as soon as possible’: Hear Tenn. bridge crews frantic 911 calls after crack found

MAIN AREA TOP drop zone ⇩

MAIN AREA TOP drop zone ⇩

ovp test

mLife Diagnostics LLC: Oral Fluid Drug Testing

Male shot by female at Shreveport apartment

Class to create biodiverse backyard

Rules for outbursts at Caddo School Board Meeting

MEMPHIS, Tenn. (NEXSTAR) —  Audio recordings of 911 dispatchers are painting a clearer picture of just how concerned bridge inspection crews were after finding a crack in a steel beam in the Interstate 40 bridge crossing the Mississippi River between Arkansas and Tennessee.

In two recordings, crews from a team handling the inspections on behalf of the Arkansas Department of Transportation can be heard pleading with dispatchers to help them stop traffic to the Hernando DeSoto Bridge after the inspectors found the separation in the beam.

Inspectors on the I-40 bridge (ARDOT photo)

“I am doing a bridge inspection here on I-40 Mississippi River Bridge, and we just found a super critical finding that that needs traffic shut down in both directions on I-40 Mississippi River Bridge,” the inspector said on the call.

Dispatchers seemed taken aback by the request and unsure of what the crews were asking of them. The crew member went on to try and explain that they had already reached out to ARDOT about the issue before again telling dispatchers that the bridge needed to be cleared.

In a second call to 911, a different member of the inspection crew tried to clarify that they needed police to stop traffic to the bridge, a while trying to keep a strong signal with dispatchers.

During a news conference Wednesday, ARDOT Director Lorie Tudor said the steel beam that had the “significant fracture” was “crucial to the structural integrity” of the bridge.

“This fracture had the potential of becoming a catastrophic event that was prevented by our staff’s diligent effort in managing our bridge inspection program,” Tudor noted.

There is currently no estimate on how long repairs to the bridge would take. The closure has not only re-routed traffic on I-40, but also blocked barge traffic on the Mississippi River under the bridge.

Opened in 1973, the bridge carries around 37,000 vehicles every day, according to 2018 statistics. Arkansas and Tennessee split the cost for repairs and maintenance of the structure, with work on the bridge usually being handled by Tennessee Department of Transportation crews.

It was announced Wednesday that a national team was heading to the bridge to conduct another inspection.

Mid-South

Copyright 2024 Nexstar Media Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed

Site Settings Survey

 

MAIN AREA MIDDLE drop zone ⇩

Trending on NewsNation

MAIN AREA BOTTOM drop zone ⇩

tt

KC Chiefs parade shooting: 1 dead, 21 shot including 9 kids | Morning in America

Witness of Chiefs parade shooting describes suspect | Banfield

Kansas City Chiefs parade shooting: Mom of 2 dead, over 20 shot | Banfield

WWE star Ashley Massaro 'threatened' by board to keep quiet about alleged rape: Friend | Banfield

Friend of WWE star: Ashley Massaro 'spent hours' sobbing after alleged rape | Banfield

Clear

la

55°F Clear Feels like 55°
Wind
1 mph E
Humidity
57%
Sunrise
Sunset

Tonight

Clear skies. Low 51F. Winds light and variable.
51°F Clear skies. Low 51F. Winds light and variable.
Wind
2 mph NE
Precip
1%
Sunset
Moon Phase
Waxing Gibbous